Last December we bought a house. It was originally built in 1949 and there’s a fair bit of renovation to do as you might expect with such an old place. So far, all of the electrics have been stripped out and replaced, two of the outbuildings (a large aviary and a small god-knows-what) have been knocked down and smashed up and then taken away by my very enthusiastic father in law and his gigantic hydraulic truck. The wallpaper is being stripped off and pasted up anew in record time and a new bathroom is being fitted upstairs, this latter part required a couple of new walls and digging up the driveway to find the mains sewer (old house!). These have been our weekends and several of my afternoons per week: DIY and liaison with handymen. The mornings are my usual work with the MariLANG project and my teaching duties at Jade. These teaching duties are about to double because my class has doubled in size since last semester. Things are going to pay off after all this work is done.
Earlier this week I was once again in the UK as part of the MariLANG project, this time for our 5th transnational partner meeting which went really well! This time we were in Kenilworth, a place I’d never been before. It has a palpable aura of sleepy little town in Warwickshire, because that’s pretty much exactly what it is. Jennie, a very hard working colleague from Greece, made a short video of the meeting which I’ll post here:
Anyway, all of this zipping about, DIY, teaching and general business has meant I’ve neglected this blog for far too long. Here’s hoping I can grow another pair of hands.
Yay! Sounds like several good reasons to not be able to write. Looking forward to reading your blog when you describe the interactions with the handymen!
Good luck with everything!
LikeLiked by 1 person
Oh man, I wandered in the other day and said hallo. The painter looked at me blankly and had no idea who I was. Eventually he twigged that this weirdly accented man must be the owner and we laughed about it 😂
LikeLiked by 1 person